Maintenance Planner
Location: Saskatoon
• Other duties as assigned.
This role is being offered as a fulltime position initially based out of Denison’s regional office in Saskatoon, Saskatchewan with
intermittent travel to the remote project site located in the Athabasca Basin. As construction progresses, the role will require more
frequent travel to the project site, and transition to a fulltime site-based position once operations commence. To be considered for
this role, applicants must be eligible to work in Canada.
Denison offers a competitive compensation and benefits package, including health and dental coverage, life insurance, employee
assistance program, bonus program, and a retirement savings plan.
OUR COMMITMENT:
Denison is committed to providing employment opportunities for Indigenous people and members of the communities near where
we operate and encourage applicants who are Indigenous and / or residents of those communities to apply and to voluntarily self-
identify the appropriate information in their application details.
At Denison, we place a high value on diversity of backgrounds and experience. We strive to create an inclusive workforce that
reflects a wide range of cultures, backgrounds, and viewpoints. Our team members are empowered to excel based on their personal
merit, qualifications, experience, ability, and job performance. Reasonable accommodations during the hiring process are available
upon request. Applicants for this role must be eligible to work in Canada.
TO APPLY:
To submit your resume and cover letter, choose one of the following methods:
SCAN CLICK EMAIL
Denison Mines –
Maintenance Planner jobs.sk@denisonmines.com
We thank all applicants for their interest, however only candidates
selected for interviews will be contacted.
OUR COMPANY:
Denison is a uranium exploration and development company listed on the NYSE American and TSX stock exchanges with interests
focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship
Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of
the Athabasca Basin region of northern Saskatchewan. In mid-2023, a Feasibility Study was completed for Wheeler
River's Phoenix deposit as an ISR mining operation, and an update to the previously prepared PFS was completed for Wheeler River's
Gryphon deposit as a conventional underground mining operation. Based on the respective studies, both deposits have the potential
to be competitive with the lowest cost uranium mining operations in the world. Permitting efforts for the planned Phoenix ISR
operation commenced in 2019 and have advanced significantly, with licensing in progress and a draft Environmental Impact Statement
('EIS') submitted for regulator and public review October 2022.
Denison's interests in Saskatchewan also include a 22.5% ownership interest in the McClean Lake Joint Venture ('MLJV'), which
includes several uranium deposits and the McClean Lake uranium mill, which is contracted to process the ore from the Cigar Lake
mine under a toll milling agreement, plus a 25.17% interest in the Midwest Main and Midwest A deposits and a 69.35% interest in
the Tthe Heldeth Túé ('THT,' formerly J Zone) and Huskie deposits on the Waterbury Lake property. The Midwest Main, Midwest A,
THT and Huskie deposits are located within 20 kilometers of the McClean Lake mill. Taken together, the Company has direct
ownership interests in properties covering ~385,000 hectares in the Athabasca Basin region.
Through its 50% ownership of Japan (Canada) Exploration Company, Ltd ('JCU'), Denison holds additional interests in various
uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%)
and Christie Lake (JCU, 34.4508%).
Visit our website at www.denisonmines.com for more information.
2